Every Rezkita Servis Sdn Bhd engagement runs through the same eight phases. The sequence is fixed because each phase depends on the one before it, and because a client should always know which stage their project is in and what they receive at the end of it.
Our approach
Eight delivery phases, in order, with a defined handover at each.
-
01
Requirements
We establish what the infrastructure has to do, the constraints it operates under, and the availability target it must hold.
You receive A written requirement statement to sign off before any design work starts.
-
02
Design
We produce the architecture, topology and specification against that requirement, sized for the load you have and the growth you have planned.
You receive Drawings, a bill of materials and a design rationale.
-
03
Procurement
We source specified equipment and confirm lead times against the programme.
You receive A procurement schedule and confirmed delivery dates.
-
04
Implementation
We install to specification, working within agreed access and shutdown windows.
You receive Progress reporting against the programme.
-
05
Testing
We test each subsystem against the design criteria and record the results.
You receive Test records, including certification traces where the work is cabling or fibre.
-
06
User acceptance
We run acceptance against the requirement statement with your team present.
You receive A signed acceptance record and a snag list with owners and dates.
-
07
Documentation
We compile the as-built record: topology, configuration backups, labelling schedule, warranty and serial register.
You receive A handover pack your team can operate from without us.
-
08
Support
We move the estate onto the agreed support arrangement, monitored under a 24/7 SLA.
You receive Defined response commitments and a named escalation path.