Our approach

Eight delivery phases, in order, with a defined handover at each.

Every Rezkita Servis Sdn Bhd engagement runs through the same eight phases. The sequence is fixed because each phase depends on the one before it, and because a client should always know which stage their project is in and what they receive at the end of it.

  1. 01

    Requirements

    We establish what the infrastructure has to do, the constraints it operates under, and the availability target it must hold.

    You receive A written requirement statement to sign off before any design work starts.

  2. 02

    Design

    We produce the architecture, topology and specification against that requirement, sized for the load you have and the growth you have planned.

    You receive Drawings, a bill of materials and a design rationale.

  3. 03

    Procurement

    We source specified equipment and confirm lead times against the programme.

    You receive A procurement schedule and confirmed delivery dates.

  4. 04

    Implementation

    We install to specification, working within agreed access and shutdown windows.

    You receive Progress reporting against the programme.

  5. 05

    Testing

    We test each subsystem against the design criteria and record the results.

    You receive Test records, including certification traces where the work is cabling or fibre.

  6. 06

    User acceptance

    We run acceptance against the requirement statement with your team present.

    You receive A signed acceptance record and a snag list with owners and dates.

  7. 07

    Documentation

    We compile the as-built record: topology, configuration backups, labelling schedule, warranty and serial register.

    You receive A handover pack your team can operate from without us.

  8. 08

    Support

    We move the estate onto the agreed support arrangement, monitored under a 24/7 SLA.

    You receive Defined response commitments and a named escalation path.